Brand Logo
Procurement inquiries with load tables and a module corner sample

Procurement inquiries

Contact BOXABL about prefab house sourcing

Send your destination, intended use and unit count to the sourcing desk. We can turn the information into supplier screening questions and coordinate the quotation, sample or inspection steps that fit your brief.

Illustrated route from a China supplier to a destination port

Sourcing desk channels

  • AddressChina sourcing coordination. Confirm any meeting location through your inquiry.
  • EmailProvide your work email in the inquiry form for a written reply.
  • PhoneInclude your number and time zone if a callback is preferred.
  • HoursSchedule calls through the inquiry thread in China Standard Time (UTC+8).
  • DrawingsList document titles and revision dates. Arrange secure exchange separately.
  • Social channelsUse the inquiry form for project correspondence.

This independent China procurement service is separate from the original brand and has no dealership authorization. Selected suppliers remain responsible for product documentation. Confirm project-specific compliance with qualified professionals in the deployment jurisdiction.

What makes two prices comparable

Describe the occupancy and whether the building stays on a permanent foundation. Include the number of houses and storeys, each floor plan’s overall length and width, and any layout features that cannot change. For example, a two-bedroom expandable module with a fixed plumbing wall needs a different quote from a shell delivered without bathroom fittings.

Use the design basis your project team has issued. Label wind speed with units and give the source, list roof and ground snow separately where available, and name the seismic basis. A catalog sheet that gives 0.50 kPa for a wall screen does not provide enough information to set a roof criterion. Leave unknown values marked as pending rather than copying figures from a search result.

Separate the finish scope from the installation scope. Record who supplies sanitary fittings, who makes the utility connection at the marriage line and who checks the foundation interface. Name your destination port and state whether the last leg has trailer length, overhead clearance or crane access limits.

Include the target delivery window and indicate whether a sample unit or a first-unit inspection should come before the batch. Flag the documents that purchasing cannot release without, such as a supplier certificate scope, a revised drawing or a container loading plan. These are checkpoints for the quotation and do not replace approval by the parties responsible for the building.